1、修船单样板综述M/V MORNING AUTO(DECK DEPARTMENT)DOCK REPAIR LIST(2006 EDITION)INDEX1 Deck-01 General service Deck-01-01 Mooring & unmooring 1:Pilot service2:Tug boat service3:Mooring & unmooring man service4:Shore lineman service Deck-01-02 Docking & undocking1:Arrange diver (for checking and adjusting bloc
2、k & remove keel block at position of bottom plug , echo sounder, log & sea chest valve etc.)2:Arrange side block3:Arrange keel block4:Fire line, extinguishers, security to be arranged during the period of dry docking5:Collect garbage at regular intervals6:Arrange portable toilet if unusable of ship
3、toilet.7:Telephone service for convenience of ship communication.8:Supply fresh water & ballast water from manhole before undocking.(before undocking inform ship chief officer fresh water, ballast water quantity and which tank to be filled, after then checking draft and trim to comply with undocking
4、 requirement.)9:Cooling water to be supplied for: reefer machine, air condition system, CO2 system during the period of ship power failure.10:Food service, if ship fails to cook.11:12: Deck-01-03 During the period of repairing1:Portable ventilation device to be arranged for repair locale due to ship
5、 ventilation repairing.2:Shore electric power to be connected during the failure of ship power or generator overhauling.3:Supply compressed air during the whole repair time4:Shore crane service for arranging repair tools.5:Portable ventilation device to be arranged for repair locale due to ship vent
6、ilation repairing. Deck-01-04 After the period of repairing1:Inform ship officer, owner engineer and surveyor for clearing.2:Remove all debris and repair dust on each car deck, after then touch up primer 2 layer on repair place. Work to be done Inspection or surveyor Quotation: Shipyard Class survey
7、or Owner Manufacturer Ships hands Superintendent Cancel Ships officer 2 Deck-02 Survey Deck-02-01 ABS surveyor Class and statutory surveyor to be arranged by ship owner. Deck-02-02 Shipyard supervisor Every day 08:00 with repair foreman, ship officer, owner engineer etc. hold safety meeting inquirin
8、g the repair process and arranging next repair project. Deck-02-03 Ship owner engineer Supervise and responsible for whole repair procedure. Work to be done Inspection or surveyor Quotation: Shipyard Class surveyor Owner Manufacturer Ships hands Superintendent Cancel Ships officer 3 Deck-03 Bottom p
9、roject Deck-03-01 Bottom plug No.Working detailQuantity & sizeMaterial1:FPT (bottom plug to be opened and closed with seal cement by shipyard)1 unit2:NO.1 BWT (P & S) (bottom plug to be opened and closed with seal cement by shipyard)2 units3:NO.2 BWT (P & S) (bottom plug to be opened and closed with
10、 seal cement by shipyard)2 units4:NO.3 BWT (P & S) (bottom plug to be opened and closed with seal cement by shipyard)2 units5:NO.4 BWT (P & S) (bottom plug to be opened and closed with seal cement by shipyard)2 units6:NO.5 BWT (P & S) (bottom plug to be opened and closed with seal cement by shipyard
11、)2 units7:NO.6 BWT (P & S) (bottom plug to be opened and closed with seal cement by shipyard)2 units8:NO.7 BWT (P & S) (bottom plug to be opened and closed with seal cement by shipyard)2 units9:APT (bottom plug to be opened and closed with seal cement by shipyard)1 units10:FWT (P & C & S) (bottom pl
12、ug to be opened and closed with seal cement by shipyard)3 units11:Stern tube cooling water tank (bottom plug to be opened and closed with seal cement by shipyard)1 unitTOTAL:20 unitsWork to be done Inspection or surveyor Quotation: Shipyard Class surveyor Owner Manufacturer Ships hands Superintenden
13、t Cancel Ships officer Deck-03-02 Zinc plateNo.Working detailQuantity & sizeMaterial1:Rudder (B-8) 30t X 150 X 30024 pieces(B-8) 30t X 150 X 3002:Stern shell and frame (B-8) 30t X 150 X 30024 pieces(B-8) 30t X 150 X 3003:Bilge keel (B-8) 30t X 150 X 30040 pieces(B-8) 30t X 150 X 3004:Inside sea ches
14、t (B-4) 30t X 150 X 20022 pieces(B-4) 30t X 150 X 2005:On Sa-log opening: zinc plate (132-65) Diametr X 20t1 piece(132-65) Dia X 20t6:Nut M16172 piecesNut M167:Nut M1244 piecesNut M128:Bolt M16360 piecesBolt M169:Circle washer M16172 piecesCircle washer M1610:Circle washer M1244 piecesCircle washer
15、M1211:Spring washer M16172 piecesSpring washer M1612:Spring washer M1244 piecesSpring washer M12 Work to be done Inspection or surveyor Quotation: Shipyard Class surveyor Owner Manufacturer Ships hands Superintendent Cancel Ships officer Deck-03-03 Bottom base lineNo.Working detailQuantity & sizeMat
16、erialShip bottom base line to be sighted and measured, three copies of record to be handed over chief officer.Work to be done Inspection or surveyor Quotation: Shipyard Class surveyor Owner Manufacturer Ships hands Superintendent Cancel Ships officer 4 Deck-04 Anchor device Deck-04-01 Chain lockNo.W
17、orking detailQuantity & sizeMaterial1:Port side chain locker rusty parts about 30 square meter at the lower half of lockers, from bottom to 3 meter above grating, including grating to be chipped and patched with two coats of bitumastic, then the whole area to applied with one coat of bitumastic solu
18、tion.40 litersBitumastic solution paint with curing agent.2:Starboard side chain locker rusty parts about 30 square meter at the lower half of lockers, from bottom to 3 meter above grating, including grating to be chipped and patched with two coats of bitumastic, then the whole area to applied with
19、one coat of bitumastic solution.40 litersBitumastic solution paint with curing agent. Work to be done Inspection or surveyor Quotation: Shipyard Class surveyor Owner Manufacturer Ships hands Superintendent Cancel Ships officer Deck-04-02 Anchor chainNo.Working detailQuantity & sizeMaterial1:Both P &
20、 S anchor chain to be lowered down and ranged out in dock.2:The first length of both P & S anchor chains to be disconnected and re-connected as the last length.(change head using)3:Both P & S anchor chain shackles to be remarked by stainless steel seizing wire or tube clips and red/white paint, then
21、 anchor and chains to be re-fitted back properly.4:Port side 2 or 3 pieces shackle crosspieces cracked and loosed which need re-welding. Work to be done Inspection or surveyor Quotation: Shipyard Class surveyor Owner Manufacturer Ships hands Superintendent Cancel Ships officer Deck-04-03 Swivel (tur
22、ning shackle)No.Working detailQuantity & sizeMaterialThere are serious abrasion on both P & S anchor chain swivel, and turning difficultly. (Suggest renewing them.)2 piecesSwivel: grade 3 Work to be done Inspection or surveyor Quotation: Shipyard Class surveyor Owner Manufacturer Ships hands Superin
23、tendent Cancel Ships officer01: Drawing Swivel drawing: Deck-04-04 Chain bolstersNo.Working detailQuantity & sizeMaterial1:Port side anchor chain deck bolsters which joint hawsehole is serious worn and torn, need inserting welding to return back normal condition.1 pieceFilling weld2:Starboard side a
24、nchor chain deck bolsters which joint hawsehole is serious worn and torn, need inserting welding to return back normal condition.1 piecesFilling weld Work to be done Inspection or surveyor Quotation: Shipyard Class surveyor Owner Manufacturer Ships hands Superintendent Cancel Ships officer Deck-04-0
25、5 Chain shackle measurementNo.Working detailQuantity & sizeMaterialBoth P & S anchor chain shackle including its joint shackle to be measured, examined and recorded, three copies to chief officer.11 kenter X 2 Work to be done Inspection or surveyor Quotation: Shipyard Class surveyor Owner Manufactur
26、er Ships hands Superintendent Cancel Ships officer02: Drawing Chain bolsters 5 Deck-05 Ship hull project Deck-05-01 Shell plate cleaningNo.Working detailQuantity & sizeMaterialShip shell to be washed, scrapped and cleaned marine growth with high pressure fresh water.(flat bottom area: X 2000 M2; ver
27、tical bottom area(green): X 2700 M2; boot top area(blue): X 730 M2; top side area (cream): X 2430 M2)12730 M2Fresh water Work to be done Inspection or surveyor Quotation: Shipyard Class surveyor Owner Manufacturer Ships hands Superintendent Cancel Ships officer Deck-05-02 Sand blasting(SA2.0) and sa
28、nd sweep(SA1.0)No.Working detailQuantity & sizeMaterial1:Flat bottom X 2000 M2: to be wholly sand-blasted(SA2.0) and sand sweep(SA1.0)2000 M2Sandblast2:Vertical bottom area X 2700 M2: to be wholly sand-blasted(SA2.0) and sand sweep(SA1.0)2700 M2Sandblast3:Boot top area (green) X 730 M2: to be wholly
29、 sandblasted(SA2.0) and sand sweep(SA1.0)730 M2Sandblast4:Lower topside area (blue) X 4870 M2: to be wholly sand-blasted(SA2.0) and sand sweep(SA1.0)4870 M2Sandblast5:Upper topside area (cream) X 2430 M2:to be wholly sand-blasted(SA2.0) and sand sweep(SA1.0)2430 M2Sandblast6:P & S ramp-way (grey) X 500 M2: to be wholly sand-blasted(SA2.0) and sand sweep(SA1.0)500 M2Sandblast