欢迎来到冰点文库! | 帮助中心 分享价值,成长自我!
冰点文库
全部分类
  • 临时分类>
  • IT计算机>
  • 经管营销>
  • 医药卫生>
  • 自然科学>
  • 农林牧渔>
  • 人文社科>
  • 工程科技>
  • PPT模板>
  • 求职职场>
  • 解决方案>
  • 总结汇报>
  • ImageVerifierCode 换一换
    首页 冰点文库 > 资源分类 > DOCX文档下载
    分享到微信 分享到微博 分享到QQ空间

    船舶修理单英文.docx

    • 资源ID:17232345       资源大小:73.76KB        全文页数:79页
    • 资源格式: DOCX        下载积分:3金币
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    三方登录下载: 微信开放平台登录 QQ登录
    二维码
    微信扫一扫登录
    下载资源需要3金币
    邮箱/手机:
    温馨提示:
    快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如填写123,账号就是123,密码也是123。
    支付方式: 支付宝    微信支付   
    验证码:   换一换

    加入VIP,免费下载
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    船舶修理单英文.docx

    1、船舶修理单英文GENERAL SERVICE 1 G-001 Vessel docking/undocking time(s) 2 G-002 Charge for the first two days in dry-dock, G-003 Charge for the rest days in dry-dock, G-004 Surcharge for docking/undocking - outside normal working hours, - weekend and/or - public holidays, days, G-005 Surcharge for docking v

    2、essel in a partly loaded condition - carrying ton(s) of cargo, - fitting/removal of additional piece(s) of side blocks, - fitting/removal of additional piece(s) of keel blocks, G-006 Towage (dock yard moves) Provide for vessel arrival and sailing, Required tugs , G-007 Pilotage Provide for vessel ar

    3、rival and sailing G-008 Riggers Provide to handle mooring lines and gangway on arrival, shifting and sailing. G-009 Wharfage G-010 Shifting Vessel to be shifted from dry-dock to repair quay without “Engine” with assistance of tugs, pilots and line handlers. G-011 Electric shore power supply, 440V, 6

    4、0Hz, Temporary connection/disconnection, G-012 Electric shore power supply, 440V, 60Hz, during repair period, G-013 Fresh water from shore, temporary connection/disconnection G-014 Fresh water supply from shore, G-015 Seawater (ballast) from shore, temporary connection/disconnection, G-016 Seawater

    5、ballast supply from shore, G-017 Cooling-water (seawater) from shore for refrigeration systems. Temporary connection / disconnection, G-018 Cooling water (seawater) supply, G-019 Fire line Temporary connection/disconnection, G-020 Fire line Maintenance and hire, G-021 Fire watch, additional, if requ

    6、ired, Remark: Fire watchman attendance for specified repairs has been included, in relevant repair items. G-022 Garbage Remove garbage and galley refuse, G-023 Shore crane hire for vessels domestic use, G-024 Provide, supply temporary telephone on board G-025 Slops (or Sludge) Disposal of sludge to

    7、reception facilities ashore, G-026 Cherry-picker Provide cherry-picker in holds for general inspection, DOCKING WORK Underwater M2 Boot topping M2 Topside M2 Remarks: The rates must include the use of dock arms, aerial platforms, cherry picker, fitting of scupper plugs, temporary lighting, temporary

    8、 protecting of anodes, echo sounder and speed log. F/C applications on underwater and topside area incl. Repainting of - draft marks - ships name bow / stern - port of registry - plimsoll marks - bow / bow thruster marks - owners letter “COSCO” on side if there exists - bay numbers - paint, owners s

    9、upply D-010 Surface Preparation D-010-1 Provide piece(s) of temporary plugging of scuppers D-010-2 Provide temporary protection of anodes, echo sounder and log transmitters. D-010-3 Provide disposal of empty paint bins. Freshwater washing, to remove dirt and contamination D-010-4 -underwater area, M

    10、2 were done, D-010-5 -boot topping area, M2 were done, D-010-6 -topside area, M2 were done, High pressure freshwater washing, Minimum _Mpa D-010-7 - underwater area, M2 were done, D-010-8 -boot topping area, M2 were done, D-010-9 - topside area, M2 were done, D-010-10 Provide water-blasting up to _

    11、Mpa on damaged / rusty areas, M2 were done, Power tool clean, D-010-11 - underwater area, M2 were done, D-010-12 -boot topping area, M2 were done, D-010-13 - topside area, M2 were done, Hand scrape / slice to remove fouling D-010-14 - underwater area, M2 were done, D-010-15 - boot topping area, M2 w

    12、ere done, D-010-16 - topside area, M2 were done, Grit blast hull plating to SA 2.5 Swedish standard D-010-17 - underwater area, M2 were done, D-010-18 - boot topping area, M2 were done, D-010-19 - topsides, M2 were done, Grit blast hull plating to SA 2.0 Swedish standard D-010-20 - underwater area,

    13、M2 were done, D-010-21 - boot topping area, M2 were done, D-010-22 - topsides, M2 were done, Grit blast hull plating to SA 1.5 Swedish standard D-010-23 - underwater area, M2 were done, D-010-24 - boot topping area, M2 were done, D-010-25 - topsides, M2 were done, D-020 Hull painting-Underwater area

    14、(Please note the maker,brand and type of painting) D-020-1 1st T/U, primer, m, dft, M2 were done, D-020-2 2nd T/U, primer, m, dft, M2 were done, D-020-3 3rd F/C, primer, m, dft, M2 were done, D-020-4 One (1) F/C of A/F, m, dft, M2 were done, D-020-5 The second F/C of A/F, m, dft, M2 were done, Hull

    15、painting-Boot topping areaD-020-6 1st T/U, primer, m, dft, M2 were done, D-020-7 2nd T/U, primer, m, dft, M2 were done, D-020-8 3rd F/C, primer, m, dft, M2 were done, D-020-9 One (1) F/C of A/F, m, dft, M2 were done, D-020-10 The second F/C of A/F, m, dft, M2 were done, Hull painting-Topsides area D

    16、-020-11 1st T/U, protection primer, m, dft, M2 were done, D-020-12 2nd T/U, protection primer, m, dft, M2 were done, D-020-13 3rd F/C, protection primer, m, dft, M2 were done, D-020-14 One F/C of finish covering paint, m, dft, M2 were done, D-020-15 The second F/C of finish covering paint, m, dft, M

    17、2 were done, Deck paintingD-020-16 M2 were done, F/C(or T/U) coat(s) of protection primer, F/C(or T/U) coat(s) of finish covering paint, D-020-17 Repainting of - ships name bow / stern D-020-18 - port of registry D-020-19 - owners letter “COSCO” on both sides D-020-20 - funnel and operators funnel l

    18、ogo incl, staging, - paint owners supply D-030 Anchor & Cables Two bow anchors : kg each Chains : port side: M,stb side: _M, dia. mm each D-030-1 Range out port and starboard anchor and anchor cables in dry-dock for survey, incl. washing down, calibrating, marking(with painting/stainless wires) and

    19、re-stowing. D-030-2 Fasten studs of chain link by welding, pieces of chain link be done. D-030-3 Clean chain lockers for survey, incl. removal and disposal of mud and remaining water. D-030-4 Provide weights of anchors. D-030-5 Change the last length of P&S chain cables to the first length. D-040 An

    20、odes D-040-1 Remove worn out zinc anodes and replace / refit new zinc anodes, incl. staging, vessels supply, - Stern Frame piece(s), Size: - Bow Thruster piece(s), Size: - Rudder piece(s), Size: - Fire Emergency Sea Chest piece(s), Size: - High Suction Sea Chest piece(s), Size: - Low Suction Sea Che

    21、st piece(s), Size: - Water Outlet Tunnel piece(s), Size: - Others piece(s), Size: Total weight of anodes approx. kg. D-050 Sea Chest, Sea Valves, Main Cross Over Line, Overboard Discharge And Storm Valves Note: Sea Chests : remove grids, clean, paint and close, incl. staging. Sea Valves : Open up in

    22、 situ, clean grind-in and close with new packings, vessels / yards supply. Strainer : Open up, clean and close. Main Cross Over : Clean, remove remaining water and mud. Butterfly Valves : Check and clean in situ, grease drive and drive gear. Storm Valves : Open up in situ, clean, renew rubber lining

    23、 with owner / yards supply on flaps and close. Logogram : Globe Valve - GV Gate Valve - GT Butterfly Valve - BV Storm Valve - SV D-050-1 Sea gratings / Discharge chest Open up, clean and paint recesses / gratings with owners A/F paint and close up on completion. D-050-2 Emergency Fire Pump Sb., Fram

    24、e D-050-3 Upper Sea chest Sb., Frame D-050-4 Lower Sea chest P., Frame D-050-5 Overboard discharge, Sb., Frame D-050-6 Overboard discharge, P., Frame D-050-7 High Sea Suction Chest, Starboard No.01 Pipe Size , water suction No.02 Pipe Size , air vent. No.03 Pipe Size , air vent. No.04 Pipe Size , st

    25、eam to sea chest. D-050-8 Low Sea Suction Chest, Port No.01 Pipe Size , water suction No.02 Pipe Size , air vent. No.03 Pipe Size , air vent. No.04 Pipe Size , air vent. No.05 Pipe Size , steam to sea chest. D-050-9 Sea Chest Emergency Fire Pump, Sb No.01 Pipe Size , water suction No.02 Pipe Size ,

    26、air vent. No.03 Pipe Size , steam to sea chest. D-050-10 Main Ballast Line (cross over) No.01 Pipe Size , after starboard strainer No.02 Pipe Size , after port strainer No.03 Pipe Size , to main c.w.s No.04 Pipe Size , to b.w pump 1 No.05 Pipe Size , to b.w pump 2 No.06 Pipe Size , to harbour c.w.s

    27、No.07 Pipe Size , to fire pump before strainer No.08 Pipe Size , to fire pump after strainer No.09 Pipe Size , to M.E air cooler No.10 - dito No.11 Pipe Size , to f.w of A.E D-050-11 Overboard Discharge, FR N0.1 Size , cooling water SB(Type: ) N0.2 Size , cooling water SB(Type: ) N0.3 Size , ballast

    28、 water SB(Type: ) N0.4 Size , ballast water PS(Type: ) N0.5 Size , auxiliaries PS(Type: ) N0.6 Size , bilge water separator PS(Type: ) N0.7 Size , f.w generator PS(Type: ) N0.8 Size , sewage PS(Type: ) N0.9 Size , boiler blow down SB(Type: ) N0.10 N0.11 N0.12 N0.13 N0.14 D-050-12 Emergency Valve N0.

    29、1 Size , bilge suction N0.2 N0.3 D-050-13 Two (2) suction seawater strainer / size : Open up, clean housing and strainer, replace and close up, incl. Removal and disposal of mud, shells and remaining water. D-050-14 Workshop Repair of Valves Following valves to be removed from line and refitted, transport to workshop and return, open up, clean, grind in, renew seals (in case of butterfly valves, re


    注意事项

    本文(船舶修理单英文.docx)为本站会员主动上传,冰点文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知冰点文库(点击联系客服),我们立即给予删除!

    温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2023 冰点文库 网站版权所有

    经营许可证编号:鄂ICP备19020893号-2


    收起
    展开