1、机械毕设外文翻译Switched Reluctance Motors Drive for the Electrical Traction in ShearerAbstractthe paper presented the double Switched Reluctance motors parallel drive system for the electrical traction in shearer. The system components, such as the Switched Reluctance motor, the main circuit of the power c
2、onverter and the controller, were described. The control strategies of the closed-loop rotor speed control with PI algorithm and balancing the distribution of the loads with fuzzy logic algorithm were given. The tests results were also presented. It is shown that the relative deviation of the averag
3、e DC supplied current of the power converter in the Switched Reluctance motor 1 and in the Switched Reluctance motor 2 is within 10%.Keywords- switched reluctance; motor control; shearer; coalmine; electrical drive.I. INTRODUCTIONThe underground surroundings of the coal mines are very execrable. One
4、 side, it is the moist, high dust and inflammable surroundings. On the other side, the space of roadway is limited since it is necessary to save the investment of exploiting coal mines so that it is difficult to maintain the equipments. In the modern coal mines, the automatization equipments could b
5、e used widely. The faults of the automatization equipments could affect the production and the benefit of the coal mines. The shearer is the mining equipment that coal could be cut from the coal wall. The traditional shearer was driven by the hydrostatic transmission system. The fault ratio of the h
6、ydrostatic transmission system is high since the fluid in hydrostatic transmission system could be polluted easily. The faults of the hydrostatic transmission system could affect the production and the benefit of the coal mines directly. The fault ratio of the motor drive system is lower than that o
7、f the hydrostatic transmission system, but it is difficult to cool the motor drive system in coal mines since the motor drive system should be installed within the flameproof enclosure for safety protection. The motor drive system is also one of the pivotal parts in the automatization equipments. Th
8、e development of the novel types of the motor drive system had been attached importance to by the coal mines. The Switched Reluctance motor drive could become the main equipments for adjustable speed electrical drive system in coal mines 1, because it has the high operational reliability and the fau
9、lt tolerant ability 2. The Switched Reluctance motor drive made up of the double-salient pole Switched Reluctance motor, the unipolar power converter and the controller is firm in the motor and in the power converter. There is no brush structure in the motor and no fault of am bipolar power converte
10、r in the power converter 34. The Switched Reluctance motor drive could be operated at the condition of lacked phases fault depended on the independence of each phase in the motor and the power converter 5. There is no winding in the rotor so that there is no copper loss in the loss and there is only
11、 little iron loss in the rotor. It is easy to cool the motor since it is not necessary to cool the rotor. The shearer driven by theSwitched Reluctance motor drive had been developed. The paper presented the developed prototype.II. SYSTEM COMPONENTSThe developed Switched Reluctance motors drive for t
12、he electrical traction in shearer is a type of the double Switched Reluctance motors parallel drive system. The system is made up of two Switched Reluctance motors; a control box installed the power converter and the controller. The adopted two Switched Reluctance motors are all three-phase 12/8 str
13、ucture Switched Reluctance motor, which were shown in Figure 1. Figure1. Photograph of the two three-phase .12/8 structure Switched Reluctance motorThe two Switched Reluctance motors were packing by the explosion-proof enclosure, respectively. The rated output power of one motor is 40 KW at the roto
14、r speed 1155 r/min, and the adjustable speed range is from 100 r/min to 1500r/min. The power converter consists of two three-phase asymmetric bridge power converter in parallel. The IGBTs were used as the main switches. Three-phase 380V AC power source was certificated and supplied to the power conv
15、erter. The main circuit of the power converter was shown in Figure 2.In the controller, there were the rotor position detection circuit, the commutation circuit, the current and voltage protection circuit, the main switches gate driver circuit and the digital controller for rotor speed closed-loop a
16、nd balancing the distribution of the loads.III. CONTROL STRATEGYThe two Switched Reluctance motor could all drive the shearer by the transmission outfit in the same traction guide way so that the rotor speed of the two Switched Reluctance motors could be synchronized. The closed-loop rotor speed con
17、trol of the double Switched Reluctance motors parallel drive system could be implemented by PI algorithm. In the Switched Reluctance motor 1, the triggered signals of the main switches in the power converter are modulated by PWM signal, the comparison of the given rotor speed and the practical rotor
18、 speed are made and the duty ratio of PWM signal are regulated as follows,where, ng is the given rotor speed, nf is the practical rotorspeed, e is the difference of the rotor speed, is the increment of the duty ratio of PWM signal of the Switched Reluctance motor 1 at k time, Ki is the integral coef
19、ficient, Kp is the proportion coefficient, ek is the difference of the rotor speed at k time, ek-1 is the difference of the rotor speed at k-1 time, D1(k) is the duty ratio of PWM signal of the Switched Reluctance motor 1 at k time, and D1(k-1) is the duty ratio of PWM signal of the Switched Relucta
20、nce motor 1 at k-1 time.The output power of the Switched Reluctance motordrive system is approximately in proportion to theaverage DC supplied current of the power converter asfollows, where, P2 is the output power of the Switched Reluctance motor drive system, Iin is the average DC supplied current
21、 of the power converter. In the Switched Reluctance motor 2, the triggered signals of the main switches in the power converter are also modulated by PWM signal. The balancing the distribution of the loads between the two Switched Reluctance motors could be implemented by fuzzy logic algorithm. In th
22、e fuzzy logic regulator, there are two input control parameters, one is the deviation of the average DC supplied current of the power converter between the two Switched Reluctance motors, and the other is the variation of the deviation of the average DC supplied current of the power converter betwee
23、n the two Switched Reluctance motors. The output control parameter is the increment of the duty ratio of the PWM signal of the Switched Reluctance motor 2. The block diagram of the double Switched Reluctance motors parallel drive system for the electrical traction in shearer was shown in Figure 3.Th
24、e deviation of the average DC supplied current ofthe power converter between the two Switched Reluctance motors at the moment of ti is :where, ei-1 is the deviation of the average DC suppliedcurrent of the power converter between the two SwitchedReluctance motors at the moment of ti-1. The duty rati
25、o of the PWM signal of the Switched Reluctance motor 2 at the moment of ti iswhere, is the increment of the duty ratio of the PWM signal of the Switched Reluctance motor 2 at the moment of ti and D2(i-1) is the duty ratio of the PWM signal of the Switched Reluctance motor 2 at the moment of ti-1.The
26、 fuzzy logic algorithm could be expressed asfollows,if and then U i = 1,2, m, j = 1,2, ,nwhere, E is the fuzzy set of the deviation of the average DC supplied current of the power converter between the two Switched Reluctance motors, EC is the fuzzy set of the variation of the deviation of the avera
27、ge DC supplied current of the power converter between the two Switched Reluctance motors, and U is the fuzzy set of the increment of the duty ratio of the PWM signal of the Switched Reluctance motor 2.The continuous deviation of the average DC supplied current of the power converter between the two
28、Switched Reluctance motors could be changed into the discrete amount at the interval -5, +5, based on the equations as follows, The discrete increment of the duty ratio of PWM signal of the Switched Reluctance motor 2 at the interval -5, +5 could be changed into the continuous amount at the interval
29、 -1.0%, +1.0%, based on the equations as follows,There is a decision forms of the fuzzy logic algorithm based on the above principles, which was stored in the programme storage cell of the controller.While the difference of the distribution of the loads between the two Switched Reluctance motors cou
30、ld be got, the duty ratio of PWM signal of the Switched Reluctance motor 2 will be regulated based on the decision forms of the fuzzy logic algorithm and the distribution of the loads between the two Switched Reluctance motors could be balanced.IV. TESTED RESULTSThe developed double Switched Relucta
31、nce motors parallel drive system prototype had been tested experimentally. Table I gives the tests results, where is the relative deviation of the average DC supplied current of the power converter in the Switched Reluctance motor 1, is the relative deviation of the average DC supplied current of th
32、e power converter in the Switched Reluctance motor 2, and, It is shown that the relative deviation of the average DC supplied current of the power converter in the SwitchedReluctance motor 1 and in the Switched Reluctance motor2 is within V. CONCLUSIONThe paper presented the double Switched Reluctance motors parallel drive system for the electrical traction in shearer. The novel type of the shearer in coal mines driven by the Switched Reluctance motors drive system contributes to reduce the fault ratio of the shearer, enhance the oper